Skip to main content
Graeme Hogg
Graeme Hogg
Apr 17, 2026 10:49:26 AM

I was six weeks into an operational improvement programme with a construction chemicals manufacturer when a conversation changed the direction of the entire engagement. It wasn't about production ...

All articles from Graeme Hogg

How AI Cut Safety Data Sheet Processing From 97.5 Hours to 10.8 Hours (85% Faster).

He Was Drowning in 120 Emails a Day. One Prompt Changed Everything.

Turbocharge Team Development: Unlocking Growth with AI Tools

Pilot to Payback: A 90 Day Downtime Saving Roadmap with AI

Elevating Manufacturing: Automated Workflows & AI Boost CapEx

Practical Steps: Kickstarting Your SME's First AI Workflow

AI-Powered Shift Reports for Smarter Production Insights

A Complete Guide to AI-Guided Onboarding: Cut Ramp-Up Time by 50%

Building Bridges: How to Get Buy-In from Shop Floor Employees

Winning or Losing as a Department: Why Visual Management Matters

UK Manufacturing Day: Could AI Be Britain's Growth Link?

Plant Utilisation Formula: Unlocking Hidden Capacity in Your Factory

OTIF - On Time In Full: Raising the Bar on Supply Chain Reliability

The Hidden Cost of Poor OTIF (On-Time-In-Full)

What is Gemba In Manufacturing?

Real Time Production Data: Why Does Your Business Need It?

Digital Adoption: Here's What You Need to Know.

Human + AI Collabration: The Cost of Doing Nothing.

Digital Transformation in Manufacturing: The Cost of Standing Still

Why is AI Important in Manufacturing? Smarter Workflows & Lower Costs.

8 Most Common Krones Labeller Faults and How to Fix Them Fast

 

Experience Extraordinary Results and drive your productivity to new heights.